Index
|
Chester Golf Club Platform
(1891 - 1896)
Chester Golf Club Halt was located north of Hawarden Bridge which carried the Bidston to Wrexham Line over the River Dee. It was first brought into use in 1891 and was a very basic affair
being constructed from timber. The line was double-track with two platforms.
The halt did not appear in the timetable but would have been served by trains on request
Chester Golf Club Platform was not in a suitable location, and so new facilities were opened to the north which could serve both Wrexham - Bidston and Chester - Bidston services.
The original halt closed when the new facilities opened on May 18 1896
|
|